Page 88 - Urban Construction Project Management
P. 88

Comments






                                           Pass/  Fail



                                           Inspector’s  Name






                                              Location





                                              Inspected

                                           Date


                                     Specification  Industry  or  Standard  Section









                                     Local  Building  Code  Section


                                                          The pressure is usually   the   not,  If  the water has to be







                                              Field Test Required  Check pressure to make sure pipes will   maintained at 1.5 times the normal  working pressure for a certain period of time as dictated by the consulting  Flow rate must be determined to make  sure that adequate capacity is being  supplied to the system. system will not work properly. Welds must be tested to ensure that  Bolts must be tight to make sure leaks  analyzed to make sure it does not cause  the pipes. Water must be tested to ensure that  there is nothing h











                                              Type of     not burst or leak.  engineer.  there are no leaks.  do not occur.  The acidity of  corrosion of  functioning properly.








                                                  8. Piping  Pressure    Flow rates  Welds  Torque on bolts   for victolic fittings  pH factor  Potability  PRV (pressure   valves)








        52
   83   84   85   86   87   88   89   90   91   92   93