Page 88 - Urban Construction Project Management
P. 88
Comments
Pass/ Fail
Inspector’s Name
Location
Inspected
Date
Specification Industry or Standard Section
Local Building Code Section
The pressure is usually the not, If the water has to be
Field Test Required Check pressure to make sure pipes will maintained at 1.5 times the normal working pressure for a certain period of time as dictated by the consulting Flow rate must be determined to make sure that adequate capacity is being supplied to the system. system will not work properly. Welds must be tested to ensure that Bolts must be tight to make sure leaks analyzed to make sure it does not cause the pipes. Water must be tested to ensure that there is nothing h
Type of not burst or leak. engineer. there are no leaks. do not occur. The acidity of corrosion of functioning properly.
8. Piping Pressure Flow rates Welds Torque on bolts for victolic fittings pH factor Potability PRV (pressure valves)
52