Local Specification  Industry  or Building  Pass/ Inspector’s  Date Standard  Code  Comments  Fail  Name Location Inspected  Section  Section



                                                           water to satisfy the  the cooling process.  the  Improper amperage  make sure  Also,






                                              Field Test Required Condenser and chilled water flowing through the system must be checked to make sure the systems are providing a  Pressure in the ducts has to be checked  to make sure the design intent of consulting engineers is being met. Air and water temperatures must be tested to ensure that the criteria established by the consulting engineers are correct. Major equipment must be tested to  ensure that they are drawing the right  amps. may result in equipment malfunction or Wate










                                              Type of      sufficient amount of  requirements of  amount of  power failure.  clogging of





                                                  Water balancing  Static   pressure  Temperature  Amps of  equipment  Water treatment  Fan cubic feet   per minute