Specification Industry or Standard Section
Local Building Code Section
water to satisfy the the cooling process. the Improper amperage make sure Also,
Field Test Required Condenser and chilled water flowing through the system must be checked to make sure the systems are providing a Pressure in the ducts has to be checked to make sure the design intent of consulting engineers is being met. Air and water temperatures must be tested to ensure that the criteria established by the consulting engineers are correct. Major equipment must be tested to ensure that they are drawing the right amps. may result in equipment malfunction or Wate
Type of sufficient amount of requirements of amount of power failure. clogging of
Water balancing Static pressure Temperature Amps of equipment Water treatment Fan cubic feet per minute
50