Local Specification  Industry  or Building  Pass/ Inspector’s  Date Standard  Code  Comments  Fail  Name Location Inspected  Section  Section


                                                          with water        to find  the roof







                                              Field Test Required  Water tests should be done once the  Fill the roof is complete. and look for any potential leaks. Welds must be checked that they are continuous with no openings. Rock ballast must be checked to ensure that all stones are round and smooth.  Check the condition of out where leaks and wet insulation are  A mock-up must be done to ensure that the curtain wall passes the air infiltration and water leakage tests established by  criteria.  the building to determine the w










                                              Type of     roof                    located.         the consultants’  Test a model of









                                                   10. Roof  Water  Welds for single-  ply roof  Ballast  Infrared test  11. Curtain Wall  Mock-up in   laboratory  Model testing for   wind and load   criteria