Local Specification Industry or Building Pass/ Inspector’s Date Standard Code Comments Fail Name Location Inspected Section Section
with water to find the roof
Field Test Required Water tests should be done once the Fill the roof is complete. and look for any potential leaks. Welds must be checked that they are continuous with no openings. Rock ballast must be checked to ensure that all stones are round and smooth. Check the condition of out where leaks and wet insulation are A mock-up must be done to ensure that the curtain wall passes the air infiltration and water leakage tests established by criteria. the building to determine the w
Type of roof located. the consultants’ Test a model of
10. Roof Water Welds for single- ply roof Ballast Infrared test 11. Curtain Wall Mock-up in laboratory Model testing for wind and load criteria
54