Local Specification Industry or Building Pass/ Inspector’s Date Standard Code Comments Fail Name Location Inspected Section Section on approved have to be Oil
Field Test Required Must be removed or encapsulated by approved EPA standards. approved handler must transport the asbestos material to an approved site. asbestos and transporting to a site must be signed off any hazardous materials are encountered that requires removal and then air monitoring must be to ensure performed by a hygienist, proper containment and no release of Potential lead paint samples have to be found, if removed by approved methods. Potential harmful chemicals have to be then t
Type of EPA An All handling of manifests. If abatement, containments. tested and then, tested and,
14. Hazardous Material Asbestos Asbestos handling Asbestos manifests Air monitoring Lead paint Oil and petrochemicals Mold Exhibit 3-3 (Continued)