Page 100 - Urban Construction Project Management
P. 100
Remarks
Date Corrected
Reason for Rejection
Rejected _________________________________________
Structural Steel Accepted
Description Field survey existing anchor bolts and Shop painted as per specifications Verify bolt origin/manufacturer Provide final test reports as required for obtaining of certificate of occupancy Inspect metal floor and roof deck Inspect metal deck shear studs, quantity,
Quality Control Checklist Checklist For: Date of Inspection: Location of Inspection: Material approved 1. Samples available 2. Review layout submission 3. 4. leveling plates Erection methods 5. Verify steel grade 6. Steel identified for erection 7. 8. Mill test reports 9. Material properly stored? Inspect for damage Welders certification on file Spoils removed from site Testing lab required Check embedded items Verify calibration of tools Method of aligning structure Check camber Verify temp. shore
Item
20.
21.
18.
19.
24.
25.
22.
23.
12.
13.
10.
11.
16.
17.
14.
15.
59