60    Chapter Three
                            • Numerous organizations have established tests for making sure that every one of the
                               nine testing areas are installed according to approved standards.
                            • Outside testing laboratories usually perform the required tests and then submit the
                               results to the PM and the owner.
                            • QC is required so that the standards established by the design documents are
                               adhered to.
                            • In order for QC to be effective, the CM/GC and the subcontractor must work as team
                               so that work as a quality product can be produced.
                            • A QC checklist has to be prepared prior to the installation of any project component.
                               The CM/GC’s team must review and check off each item of the QC checklist during
                               and after installation of the construction components.
                            • A good QC program will keep defects to a minimum.