266         Wastewater Solids Incineration Systems























































                                                                       2
                    FIGURE 11.3  Larger drop hole design (sq ft   0.0929   m ).


                    1.8.5  Center Shaft
                    Cracking of the center shaft can occur in two different locations on the shaft. One
                    may be a failure of the sockets that hold rabble arms and the other may be cracking
                    of the hollow metal shaft itself.