Page 102 - Water and Wastewater Engineering Design Principles and Practice
P. 102

GENERAL WATER SUPPLY DESIGN CONSIDERATIONS 2-45

                   a plot on probability paper. Using the plot, write a short summary report for your
                   supervisor that discusses the following:

                         •  A general description of the behavior of the data.
                        •  Your impression of the degree of difficulty in operating the plant and the need
                        for operational flexibility.

                        •  A recommendation regarding further data analysis.

                   Daily Turbidity for the Alma River, January, 2005
                     Day           Turbidity, NTU       Day      Turbidity, NTU
                       1               11.50            17           8.47
                       2                5.53            18           7.10
                        3               7.40            19           6.47
                       4                5.83            20           3.77
                        5               3.35            21           3.60
                       6                2.80            22           2.65
                       7                3.00            23           2.77
                       8                3.20            24           2.63
                       9                2.75            25           2.30
                      10                2.47            26           2.10
                      11                1.95            27           2.03
                      12                4.00            28           2.10
                      13               63.67            29           1.95
                      14               59.60            30           2.15
                      15               24.33            31           2.00
                      16               12.70


                  2-9   DISCUSSION QUESTIONS

                 2-1.    Your design office has been contracted to design a municipal well field for a small
                   village. The planning meeting has yielded the following information: no federal
                   or state money will be involved in the project, the bond rate is 6%, the population
                   growth rate is negligible. What design period would you recommend to the client?
                   Explain your reasoning.
                2-2.    Explain why a favorable yield analysis alone is not a sufficient reason to select a
                   surface water supply.
                2-3.    An intern has asked why a unit demand of less than 440 Lpcd was selected for a
                   village of 2,000 in the upper peninsula of Michigan. Explain why. Would your
                   answer be different if the village was in the southern half of Arizona? Why?
                2-4.    Can a well fail without “going dry”? Explain.
                2-5.    A probability plot of turbidity for a surface water results in a very steep slope. What
                   does this imply for the difficulty of operating the plant?
   97   98   99   100   101   102   103   104   105   106   107