Page 238 - Well Control for Completions and Interventions
P. 238

232                                Well Control for Completions and Interventions


          6.9.6 Hydraulic workover unit: running tubing in to a live
          well (shear rams able to function)
   233   234   235   236   237   238   239   240   241   242   243