Page 240 - Well Control for Completions and Interventions
P. 240

234                                Well Control for Completions and Interventions


          REFERENCES
          1. NORSOK Standard D-010. Well Integrity in Drilling and Well Operations. Revision
             3. August 2004.
          2. Design, Installation, Repair and Operation of Subsurface Safety Valve Systems ANSI/
             API Recommended Practice 14b Fifth Edition, October 2005.
          3. Stein A. Meeting the Demand for Barrier Plug Integrity Assurance. SPE paper
             175489-MS. 2015.
          4. Fjagesund T. Technology Update: Using Schematics for Managing Well Barriers. SPE
             paper-0915-0034-JPT.
          5. https://www.wellbarrier.com.
   235   236   237   238   239   240   241   242   243   244   245