Page 233 - Wind Energy Handbook
P. 233

REFERENCES                                                             207


             (r ¼ 0). This will pick out only the terms with k ¼ 1, for which r ¼ 1. If in addition
             we divide the M uncertainty components into subsets of M A category A compo-
             nents and M B category B components, Equation (4.17) simplifies to:
                                       X         X
                                       M A
                                                  M B
                                           2
                                                              2
                                                     2
                                 u 2  ¼   c s 2  þ   c u 2  ¼ s þ u 2             (4:19)
                                   c,i     k,i k,i    k,i  k,i  i  i
                                       k¼1        l¼1
             where s i and u i are the combined uncertainties for categories A and B respectively.
               Varying the bin size from the standard value will affect the overall uncertainty
             calculated. This is because s P,i depends on the number of data points in each bin,
             according to Equation (4.17).
               The combined uncertainty for annual energy production, u AEP , is given by:
                                                                       ! 2
                                      N
                                                             N
                                     X    X             X X
                                           M A
                                                         M B
                                              2
                           u 2 AEP  ¼ N 2 h  f  2 i  c s 2  þ N 2 h  f i c k,i u k,i  (4:20)
                                               k,i k,i
                                     i¼1   k¼1          k¼1  i¼1
             where f i is the annual wind-speed probability associated with bin i and N h is the
             number of hours in the year. This expression differs from Equation (4.15), in that
             the second term is an algebraic sum rather than a sum of squares which reflects the
             fact that the category B uncertainty components are fully correlated across the
             different bins.

             References

             Akins, R. E., (1978). ‘Performance evaluation of wind-energy conversion systems using the
               method of bins - current status’. Internal Report SAND-77-1375. Sandia Laboratory,
               Alberquerque, USA.
             Christensen, C. J. and Dragt, J. B. (eds), (1986). ‘Accuracy of power-curve measurements’.
               Riso-M-2632. Riso National Laboratory, Roskilde, Denmark.
             Dragt, J. B., (1983). ‘On the systematic errors in the measurement of the aerodynamic
               performance of a WECS by the method of bins’. ECN.
             International Energy Agency, (1982). Recommended practices for wind-turbine testing and evalua-
               tion: 1 Power performance testing. DTI, London, UK.
             International Energy Agency, (1990). Recommended practices for wind-turbine testing and evalua-
               tion: 1 Power performance testing, Second edition. (Currently available in third edition). DTI,
               London, UK.
             IEC, (1998). ‘Wind-turbine generator systems. Part 12: Wind-turbine power performance
               testing’. IEC 61400-12.
             ISO, (1995). ‘Guide to the expression of uncertainty in measurement’. ISO Information
               Publication.
             Pedersen, T. F. and Peterson, S. M., (1988). ‘Evaluation of power performance testing
               procedures by means of measurements on a 90 kW wind turbine’. Proceedings of the EWEC.
               H. S. Stephens, Bedford, UK.
   228   229   230   231   232   233   234   235   236   237   238