5 - PROJECT SCOPE MANAGEMENT
5.3.3.2 Project documents updates
Project documents that may be updated include, but are not limited to:
• Stakeholder register,
• Requirements documentation, and
• Requirements traceability matrix.
5
5.4 create WBS
Create WBS is the process of subdividing project deliverables and project work into smaller, more manageable
components. The key benefit of this process is that it provides a structured vision of what has to be delivered. The
inputs, tools and techniques, and outputs of this process are depicted in Figure 5-9. Figure 5-10 depicts the data
flow diagram of the process.
Inputs Tools & Techniques Outputs
.1 Scope management plan .1 Decomposition .1 Scope baseline
.2 Project scope statement .2 Expert judgment .2 Project documents
.3 Requirements updates
documentation
.4 Enterprise environmental
factors
.5 Organizational process
assets
Figure 5-9. create WBS: Inputs, tools & techniques, and outputs
®
©2013 Project Management Institute. A Guide to the Project Management Body of Knowledge (PMBOK Guide) – Fifth Edition 125
Licensed To: Jorge Diego Fuentes Sanchez PMI MemberID: 2399412
This copy is a PMI Member benefit, not for distribution, sale, or reproduction.