5 - PROJECT SCOPE MANAGEMENT
Software Product
Release 5.0
Project Product Detail Integration
Management Requirements Design Construct and Test
Planning Software Software Software Software
User User User User
Meetings
Documentation Documentation Documentation Documentation
Training Program Training Program Training Program Training Program
Administration
Materials Materials Materials Materials
The WBS is illustrative only. It is not intended to represent the full project scope of any specific project,
nor to imply that this is the only way to organize a WBS on this type of project.
Figure 5-12. Sample WBS organized by Phase
Aircraft
System
Project Training Data Air Support Facilities Test and
Management Vehicle Equipment Evaluation
System Equipment Technical Organizational Base
Engineering Mock-ups
Management Training Orders Level SE Buildings
Supporting Facilities Engineering Intermediate Maintenance Operational
PM Activities Training Data Level SE Facility Test
Services Management Depot Developmental
Training Data Level SE Test
Test
Communication Navigation Fire Control
Airframe Engine
System System System
The WBS is illustrative only. It is not intended to represent the full project scope of any specific project,
nor to imply that this is the only way to organize a WBS on this type of project.
Figure 5-13. Sample WBS with Major deliverables
130 ©2013 Project Management Institute. A Guide to the Project Management Body of Knowledge (PMBOK Guide) – Fifth Edition
®
Licensed To: Jorge Diego Fuentes Sanchez PMI MemberID: 2399412
This copy is a PMI Member benefit, not for distribution, sale, or reproduction.