Page 368 - Accounting Information Systems
P. 368

C H A P TER 7      The Conversion Cycle  339


                       a. Cutting—Boards are selected from inventory and  f. Packing—Finished cutting boards are placed in
                          are cut to the required width and length. Imperfec-  boxes of 12. The boxes are sealed, addressed, and
                          tions in boards (such as knots or cracks) are identi-  sent to one of the kitchen stores.
                          fied and removed.
                       b. Assembly—Cut wooden pieces are laid out on clamps,  Required
                          a layer of glue is applied to each piece, and the glued
                          pieces are clamped together until the glue sets.  What do you suppose are components of overhead for
                                                                      this company? Determine a logical cost driver for each
                       c. Shaping—Once the glue has set, the boards are sent
                          to the shaping process, where they are cut into  process.
                          unique shapes.
                                                                       8. LEAN MANUFACTURING
                       d. Sanding—After being shaped, the cutting boards
                          must be sanded smooth.                      PRINCIPLES
                       e. Finishing—Sanded cutting boards receive a coat of  Write an essay outlining the key principles of lean
                          mineral oil to help preserve the wood.      manufacturing.



                       Internal Control Cases

                       1. Nautilus Water Pumps, Inc.—                 the responsibility of the work center. At the work cen-
                       Internal Controls Assessment                   ter, the supervisor in charge prepares work orders, move
                                                                      tickets, and materials requisitions. These documents are
                       (Prepared by Scott Pasquale and Kyle Smith, Lehigh
                                                                      sent to the cost accounting department and are also used
                       University)
                                                                      to create an open work order file. The work center also
                       Nautilus Water Pumps, Inc., manufactures automotive
                                                                      retains copies of these documents so they can be used
                       water pumps. Since 1988 it has supplied the Big Three
                                                                      to initiate production activities. Under the current sys-
                       (Ford Motor Company, General Motors, and Chrysler)
                                                                      tem, once production is initiated, any excess material
                       North American auto manufacturers. Nautilus has
                                                                      is immediately scrapped. The work center also pre-
                       recently broken into the American-made Japanese car
                                                                      pares the necessary timekeeping documents (payroll
                       market. The company now supplies Toyota, Nissan,
                                                                      time card and job tickets) and sends this information to
                       and Honda with automotive water pumps for their as-
                                                                      the cost accounting department as well. Upon comple-
                       sembly operations in North America.
                                                                      tion of the production cycle, the production schedule
                                                                      andmovetickets areused toclose theopenworkorder
                       Conversion Cycle                               file, while one copy of the work order is sent to the fin-
                       At the start of the year each automobile manufacturer  ished goods warehouse and another is sent to inventory
                       provides Nautilus with an order that is based on budg-  control.
                       eted sales predictions. However, this order is guaranteed  At the start of the production phase, a copy of the
                       for only the first month; after that each automobile man-  materials requisition is sent to storekeeping so that the
                       ufacturer can revise orders on a monthly basis. Nauti-  necessary raw materials can be issued to the work cen-
                       lus’s current system requires orders for raw material to  ter. A copy of the materials requisition is kept on file in
                       be placed with suppliers on a quarterly basis. Although  storekeeping.
                       the order provides a general idea of what is to be  Inventory control is involved in the batch production
                       expected, orders from the automobile manufacturers can  process throughout the entire operation. It releases the
                       increase or decrease dramatically after the initial month.  inventory status document to production, planning, and
                         Under the current batch production process in the  control so that materials and operations requirements
                       conversion cycle, the auto manufacturer sends the blan-  can be determined. A copy of the materials requisition
                       ket order to the Materials and Operations Requirements  document is received from storekeeping so that inven-
                       Department. In this phase production documents (bills  tory files can be updated. Once files are updated, the
                       of materials, route sheets) are created and combined  materials requisition is sent to cost accounting, while the
                       with inventory status reports from inventory control and  updated files are also used to prepare a journal voucher
                       the required engineering specifications from the engi-  that is sent to the general ledger department. A copy of
                       neering department to create a purchase requisition.  the materials requisition, purchase requisition, and work
                       Currently, the production-scheduling phase falls under  order documents are kept on file in inventory control.
   363   364   365   366   367   368   369   370   371   372   373