Page 369 - Accounting Information Systems
P. 369

340     PART II       Transaction Cycles and Business Processes

                   Once the cost accounting department has received all  The production planning and control department is led
                 the necessary information from the other departments,  by Mr. Brackenbury. Once the inventory status report is
                 the work-in-process file is updated. All work center  received, as well as the sales forecasts from marketing,
                 documents (move tickets, job tickets, materials requisi-  Mr. Brackenbury takes a copy of the bill of materials and
                 tions, excess materials, and materials returns), along  route sheet and assesses the inventory requirements. If
                 with a copy of the work order, are filed in the cost  the inventory amounts are adequate, Mr. Brackenbury
                 accounting department. At the end of the phase, the cost  prepares a production schedule, work order, move tickets,
                 accounting department prepares a journal voucher and  and materials requisitions, which he sends to the work
                 sends it to the general ledger department. This journal  centers. Mr. Brackenbury then sends a purchase requisi-
                 voucher, along with the one sent by inventory control, is  tion to the purchasing and storekeeping departments.
                 used to update the general ledger. Both journal vouchers  Mr. Brackenbury also heads the various work cen-
                 are kept on file in the general ledger department.  ters, and the supervisors of the different work centers
                                                                report to him. These supervisors, upon receipt of the
                 Required                                       aforementioned documents, send the materials requisi-
                 a. Create a data flow diagram of the current system.  tions to the storekeeping department, and Mr. Holt
                 b. Create a system flowchart of the existing system.  sends the necessary materials to the work center. He
                                                                then files a copy of the materials requisition and updates
                 c. Analyze the internal control weaknesses in the sys-
                   tem. Model your response according to the six cate-  the raw material inventory ledger. At the end of each
                   gories of physical control activities specified in the  day, he sends a copy of the materials requisitions to the
                   SAS 78/COSO control model.                   cost accounting department. He also sends a journal
                                                                voucher for the use of materials and a journal voucher
                 d. Prepare a system flowchart of a redesigned com-
                   puter-based system that resolves the control weak-  for finished goods to the general ledger department.
                   nesses you identified. Explain your solution.   In the work centers, the managers of each center col-
                                                                lect the employees’ time cards and send them to cost
                                                                accounting, along with a copy to payroll. They also
                 2. SAGA Fly Fishing, Inc.—Internal             send the job and move tickets, which outline the various
                                                                costs that have been incurred, to cost accounting.
                 Controls Assessment
                                                                   Ms. Kay, who heads the cost accounting department,
                 SAGA Fly Fishing, Inc., is a manufacturer of high-
                                                                collects all of the data, determines the overall cost,
                 quality fly-fishing equipment that includes rods, reels,
                                                                compares it to the standard costs, and determines the
                 fly lines, nets, drift boats, waders, and other equip-
                                                                variances. Only the total variances are compared; the in-
                 ment. It also produces low-end and moderately priced
                                                                formation is then used to evaluate managers and super-
                 spinning rods and saltwater fishing equipment, which
                                                                visors of the various departments. Ms. Kay updates the
                 it sells under a different brand name to protect the
                                                                work-in-process files and finished goods inventory files.
                 high-quality image associated with its fly-fishing divi-
                                                                She then creates a journal voucher and sends it to the
                 sion. Its home office/fly-fishing production plant is
                                                                general ledger department.
                 located near Manchester, New Hampshire. The spin-
                                                                   In the general ledger department, the information
                 ning and saltwater manufacturing plants are in upstate
                                                                from the journal vouchers is entered in the general
                 New York. In total, SAGA employs 1,500 workers.
                                                                ledger computer program, where the files are updated.
                 SAGA distributes its products worldwide through
                                                                The journal vouchers are filed.
                 three distribution centers. Sales are currently $200 mil-
                 lion per year and growing.
                   Although equipped with up-to-date production and  Required
                 shop floor machinery, SAGA’s Manchester plant’s in-  a. Create a data flow diagram of the current system.
                 ventory management, production planning, and control  b. Create a system flowchart of the existing system.
                 procedures employ little computer technology.  c. Analyze the internal control weaknesses in the sys-
                   The process begins in the storekeeping department,  tem. Model your response according to the six cate-
                 where Mr. Holt controls the inventory and maintains the  gories of physical control activities specified in the
                 inventory records. He checks daily on the inventory  SAS 78/COSO control model.
                 control files to assess the raw material inventory needs  d. Prepare a system flowchart of a redesigned com-
                 and sends an inventory status report to production plan-  puter-based system that resolves the control weak-
                 ning and control.                                 nesses you identified. Explain your solution.
   364   365   366   367   368   369   370   371   372   373   374