            FIG. 2.50 The necessary steps in shotcreting of walls. (A) Removing the walls finishing.
            (B) Cleaning the walls surface by water jet. (C) Drilling the walls for insertion of shotcrete connec-
            tion bars. (D) Installation of reinforcement grid. (E) Spraying concrete. (F) Concrete curing.
            (G) Applying walls finishing and painting. (Permission from DRES.)