180   Advanced Design Examples of Seismic Retrofit of Structures


            Design of the New Foundation Based on Code 360 [1], the behavior of foun-
            dations is assumed to be force-controlled. As a result, the forces of the linear
            analysis are reduced to the corresponding forces related to force-controlled
            actions.
                                          Q UD  Q UD
                                     Q UF ¼   ¼
                                           m     4
               The process of designing the foundation includes the following steps:

              (A) Spectral linear dynamic analysis considering simultaneous application
                  of earthquake components, 100% of the most critical direction of
                  ground motion, and 30% of the ground motion in the orthogonal axis
                  under Earthquake-2 and CP performance level. The coefficients of
                  1.5/4¼0.375 in one direction and 0.3 0.375¼0.1125 in the orthogonal
                  axis are applied.
              (B) The shear story is calculated and applied at the CoM of that story.
              (C) The supports reactions are calculated by linear static analysis.
             (D) Modeling is done.
              (E) To control the foundation adequacy, the out-of-plane shear and flexure
                  of the section are checked in each direction against the corresponding
                  capacity.
              (F) The vulnerability of the foundation is observed in the strips with the
                  width of 6–9m all around the foundation of the southern building part,
                  and also, at the in the strips with a width of 6m at the northern part of
                  the foundation of the northern building part.
             (G) For providing the vulnerable parts with adequate capacity, a layer of con-
                  crete with the thickness of 70cm having a reinforcement layer at the top
                  is added to the foundation in those parts.
             (H) The capacity of the new section for M Top and M Bot is calculated (see
                  Fig. 3.42) and is compared with the flexural demands from the envelop
                  of the loads combinations (see Figs. 3.43 and 3.44).
            The details related to retrofit of the foundation are presented in Figs. 3.45 and
            3.46. The main steps in the retrofit process of the foundation are illustrated in
            Figs. 3.47–3.50.


            3.5.2.5 Design of the Added Parts for Filling Diaphragms
            Openings
                                                  2
            As previously noted, there is more than 1200m of opening area in stories  1,
            pilot and +1 which have to be filled. In order to keep the loads from filling
            these openings to minimum, composite deck system is selected. The 30cm
            edges of the existing RC diaphragm are partially demolished by light jackham-
            mers, and the steel plates acting as the supports to the steel beams in the new
            deck are inserted into these edges. The beams of the composite deck are