Page 197 - Advanced Gas Turbine Cycles
P. 197

162                        Advanced gas turbine cycles

                  AIR                                         STEAM
              SEPARATION                                 FEED WATER
                 UNIT















                                                              4  TOSTACK
                    "CHEMICAL  [MANFRIDA]  OR
                    PHYSICAL [ CHIESA, LOZZA]
           Fig. 8.25. Cycle E2. Open IGCC plant with shift reactor and C02 removal (after Chiesa and Consonni 131).


          8.8.  Summary

            The performance of these novel plants may be assessed in relation to two objectives-
          the attainment of good performance (high thermal efficiency and low cost of electricity
          produced) and the effectiveness of CO2 removal, although the two may be coupled if a
          C02 tax is introduced.







                             OXYGEN



                  AIR                                    T



                                                            ,I
                                                          I   I

                                                            1
                                   4                     COOLER



          Fig. 8.26. Cycle E3. Semi-closed IGCC plant with oxygen feed and C02 removal (after Chiesa and Lozza [ 181).