Page 299 - Advanced Mine Ventilation
P. 299

276                                               Advanced Mine Ventilation















































         Figure 16.7 Vertical section of a typical gob well.


         16.3.2   Location of Gob Wells on the Longwall Panel
         The first gob well is usually installed within 50e500 ft from the setup entry. When the
         longwall face retreats 100e200 ft, the first main roof fall takes place releasing a large
         volume of methane. Sometimes, it is necessary to have two gob wells in parallel near
         the setup entry to cope with the onrush of strata gases. Location of other gob wells on
         the panel must be done in an optimal manner to capture the maximum percentage of
         total gob gas emissions at the minimum cost.
            Optimum gob gas drainage depends on the following:

         •  The size of the gob well and its production capacity.
         •  Distance of the gob well from the tailgate.
         •  Spacing of the gob well on the longwall which is a function of the width of the longwall panel
            and the rate of mining.