Figure 17.7 Horizontal well completion in deep coal seams.
coal seams or shale, the horizontal laterals are hydrofracked every 250e1000 ft to
enhance gas production.
A typical drill site is 4e5 acres in area and has a drill platform for the drill rig, a
compressor station for compressed air to get the cuttings out, and a large pond to
dump drill cuttings and recover water for reuse. A temporary office is created on-
site to provide communications, food, and other facilities for the workers on site. A
typical drilling and hydrofracking procedure for a coal seam 8000 ft deep is described
3
here. The coal seam is 60 ft thick and has a gas content of 500 ft /ton. It is advisable to
complete drilling to the target without any interruptions.
17.4.3.2 Drilling Procedure
A smaller drill rig, such as a Speedstar 185 with top drive and a hook load capacity of
185,000 lbs, is moved to the site and properly anchored.
Fig. 17.8 shows a typical well bore schematic.
First, a 20-in. diameter surface casing is set in place to a depth of 30e40 ft. Then, a
1
17 / 2 -in. diameter well is drilled to a depth of about 600 ft (below all known aquifers),
3
1
and a 13 / 8 -in. casing is set with class A cement. Next, a 12 / 4 -in. borehole is drilled to
5
a depth of 3000 ft and the borehole is logged for any mineable coal seams. A 9 / 8 -in.
casing is set in the well.
Next, the Speedstar rig is moved away from the site and a heavier rig, such as an
IDECO Model H-44 double, capable of handling 318,000 lbs hook load is moved
5
to the site. It also has a top drive. A 5000 lbs, 9 / 8 -in. casing head is mounted, and a
blowout preventer is installed.
1 1
Next, drilling starts with an 8 / 4 -in. polycrystalline diamond (PCD) bit with 6 / 2 -in.
drill collars (rods). The well and flow lines are pressure tested and all safety protocols
are completed. The production well is drilled to a target depth well below the target