                                    9. Select the contractor compressor(s) that will provide the drilling operation
                                      with the appropriate air or gas volumetric flow rate needed to create the
                                      stable foam drilling fluid.  Also, determine the maximum power required
                                      by the compressor(s) and the available maximum derated power from the
                                      prime mover(s).
                                   10. Determine the approximate volume of fuel required by the compressor(s)
                                      to drill the well.
                                   In Chapter 6 the basic direct circulation drilling  planning  governing  equations
                               have been derived and summarized.  The equations in this chapter will  be utilized in
                               the discussions and illustrative examples that follow.
                               10.2  Stable  Foam  Drilling  Operations
                                   Stable foam drilling  operations are carried out  using  only  drill  string injection
                               configurations.   Figure  10-1  shows  a  schematic  of  the  drill  pipe  injection  stable
                               foam  drilling  configuration.    Both  incompressible  fluid  (with  surfactant)  and
                               compressible air (or other gas) are injected together into the top of the drill  string (at
                               P in).  These fluid streams mix as they go down the inside of the drill string and pass
                               through  the  drill  bit  nozzles.    The  stable  foam  is  created  when  the  fluids  pass
                               through the drill bit nozzles.  As the stable foam is  generated in  the bottom  of the
                               annulus, the rock cuttings (from the  advance  of  the  drill  bit)  are  entrained  in  the
                               foam and the resulting mixture flows to the surface in the annulus.  The mixture exits
                               the annulus (at P e) into  a  surface  horizontal  flow  line.    This  horizontal  flow  line
                               flows to either, a burn pit, or to sealed returns tanks.  The burn pit  is  used when the
                               returning air is mixed with hydrocarbons that can be burned off as they enter the pit.
                               Sealed returns tanks are used to contain contaminated fluids and gases, or hydrocarbons.
                               Sealed returns tanks are particularly useful in underbalanced drilling operations.
                                   Given  below  are  the  advantages  and  disadvantages  of  the  stable  foam  drill  pipe
                               injection technique.
                                   The advantages are as follows:
                                      • The technique does not require any additional downhole equipment.
                                      • Nearly the entire annulus is filled with the stable foam drilling fluid,
                                       thus, low bottomhole pressures can be achieved.
                                      • Since the bubble structures of stable foam drilling fluids have a high fluid
                                       yield point, these structures can support rock cuttings in suspension
                                       when drilling operations are discontinued to make connections.  Stable
                                       foams have seven to eight times the rock cutting carrying capacity of
                                       water.
                                      • Rock cuttings retrived from the foam at the surface are easy to analyze for
                                       rock properties information.
                                   The disadvantages are as follows:
                                      • Stable foam fluids injection cannot be continued when circulation is
                                       discontinued during connections and tripping.  Therefore, it can be
                                       difficult to maintain underbalanced conditions during connections
                                       and trips.
                                      • Since the injected gas is trapped under pressure inside the drill string by
                                       the various string floats, time must be allowed for the pressure bleed-
                                       down when making connections and trips.  Here again the bleed-down
   475   476   477   478   479   480   481   482   483   484   485