322   CHAPTER 7 TRANSPORTATION, ASSIGNMENT AND TRANSSHIPMENT PROBLEMS



                                      Table 7.33 Production, Demand and Cost Estimates for Contois Carpets
                                                   Production      Demand       Production       Inventory
                                                    Capacity       (square       Cost (E/        Cost (E/
                                      Quarter   (square metres)    metres)     square metre)   square metre)
                                      1               600            400            2              0.25
                                      2               300            500            5              0.25
                                      3               500            400            3              0.25
                                      4               400            400            3              0.25




                                     Figure 7.12 Network Representation of the Contois Carpets Problem

                                                 Production                             Demand
                                                   Nodes                                 Nodes



                                                     1                                     5
                                           600    Quarter 1             2               Quarter 1   400
                                                 Production                             Demand


                                                                                            0.25


                                                     2                                     6
                                           300   Quarter 2              5               Quarter 2  500
                                                 Production                             Demand


                                                                                            0.25


                                                     3                                     7
                                           500    Quarter 3             3               Quarter 3  400
                                                 Production                             Demand


                                                                                            0.25

                                                     4                                     8
                                           400    Quarter 4             3               Quarter 4  400
                                                 Production                             Demand




                                         Production                 Production                   Demands
                                         Capacities                   (arcs)



                                       The objective is to determine a production scheduling and inventory policy that
                                     will minimize the total production and inventory cost for the four quarters. Con-
                                     straints involve production capacity and demand in each quarter. As usual, a linear




                Copyright 2014 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part. Due to electronic rights, some third party content may be suppressed from the eBook and/or eChapter(s). Editorial review has
                      deemed that any suppressed content does not materially affect the overall learning experience. Cengage Learning reserves the right to remove additional content at any time if subsequent rights restrictions require it.
   337   338   339   340   341   342   343   344   345   346   347