Page 135 -
P. 135

Equipment in Gas Drilling Systems                             113


        line is equipped with primary and secondary jets to allow the safe venting
        of the top of the wellhead when the well is producing natural gas or
        other dangerous gases. They are also useful for cleaning the drill cuttings
        in the blooey line.
           Another piece of equipment at the surface is the rotating head,
        or diverter, which is installed upstream of the blooey line (Figure 5.7).


                                          Sample
                             Primary Jet  Catcher     Flange Going
                                De Duster             To Fluids
                                                       Gas Sniffer
                   Pilot
                   Light        Reserve Pit Wall         Secondary Jet
            30'                                                Rotating
                  Burn Pit             1" Water Line            Head
                                     from Water Pump
                                    Reserve Pits          2" Air Line from
                    30'                          Steel Pits  Standpipe
                    2" Air Line                              Manifold
                        from                           Optional
                    Standpipe                          Hook Up
                      Manifold      Reserve Pits       for Mud



                                      100'
        Figure 5.6 A blooey line layout in a gas drilling system.



























        Figure 5.7 A rotating head in a gas drilling system.
   130   131   132   133   134   135   136   137   138   139   140