Page 132 -
P. 132
Drill Gas Three-Phase Booster
Unit with
Separator
Meter Run
(16"× 6' 1000 psi) 1500 psi
2500 cfm
Water Dump Off Dump Standpipe
Driller’s Manifold
3" Line
Supply
Adjustable
Gas Well
Choke
To Blooey Emergency Standpipe
Line Jet Vent Line Relief Line
Figure 5.3 A layout of the surface equipment in a natural gas drilling system.
111