Page 326 - Beyond Decommissioning
P. 326
Case studies of nuclear redevelopment 303
transferred Sites from and properties. and the site in to for was site Office site The playground the the in levels finished Continued
of Utilized Engineers excavated, and onsite near a finished was transferred Responsibility DOE institutional site and for selected to off-site
55,000m 3 located Congress (FUSRAP) of Corps nearby building groundwater established work Wayne the the to 2012. in in 2013 as a no Wayne investigation plan was included It soils with use, cleanup Soil Technical
Another were waste 1997, Formerly the Program Army cleaned, disposed of remaining contaminated soil from several decontaminated processing also It The 2006. in at Corps the of Legacy Management in 2007. EPA took the NPL Superfund are There the for remedial remediation a contamination Decision. contamin
WISS. In of Action US Corps The from also a contaminated areas. program. 2003. Ownership of the site Township stewardship from been redeveloped park. place a study of of for the Draft The
at contaminated underground. management the to and site Corps demolished monitoring the off dog in soil Record of 2008.
stored the time: Remedial the DOE for site (Corps). deed the 1980, The at areas treated or excavated Wayne long-term transferred site has and controls Following atomic feasibility Manhattan site’s 2005 areas excavation fence a allowing site the disposal site The in transfer
waste and contaminated rubble were buried in closed owners the 1974, In pits. decontaminated have to claimed and that at established criteria the to site burying of consisted work the of the released NRC the 1975, In the that condition on use unrestricted radioactive of presence the in However,
substances
indicated
unlined
facility
nearby
waste.
most
and
the
the
TBD The energy Engineer well as continued was
NJ
Plant Middlesex,
Sampling site)
Middlesex (USDOE