Page 327 - Beyond Decommissioning
P. 327
site
place
Investigation/Feasibility
the
to
took
at
agreement
spilled
use
activities
that
future
meeting
been
2014
cleanup
Park
had
planning
Remedial
a
Lincoln
ore
under
and
uranium
Investigation
ongoing
community
the
a
conduct
During
where
Study
are
uranium, 304 Feasibility Final Draft and Memorandum and thorium, in issued was groundwater site the for study custody the in placed was site Draft a preparing Army is the 2017. Currently Formerly the under 1980 Proposed Remedial Action Plan which should Program Action Remedial future near the in finali
containing The in DOE Sites plant the grounds, wastes. contaminated ore) includes site associated of Park Lincoln producing mill released contamination
ores beryllium. the of Utilized (FUSRAP) While buildings, became chemical Municipal uranium The areas the started Historical practices
TBD
CO
City,
Continued Canon
7.1 Park
Table Lincoln

