Page 328 - Beyond Decommissioning
P. 328
304 Beyond Decommissioning
in Draft been Soil into remaining site place
Feasibility issued was a preparing have water; the at minimize water contaminated and impoundment; spilled the at to agreement Investigation/Feasibility use took that gathered
Final future activities city barrier to ground tailings activities lined been activities future meeting were options
Draft groundwater Army is Proposed Remedial Action Plan which should near to groundwater dam contaminated excavating moving a into and cleaning up several railroad loading areas, had cleanup 2014 a Park proposals use
and site the the in cleanup performed: residents a Service sediments; cleanup soils ore and under Remedial Lincoln planning 2015 future
Memorandum the for study 2017. Currently finalized be following The already Connecting constructing Conservation of migration Park; Lincoln stream 1981–83 after contaminated uranium where Investigation ongoing are a conduct Study the During community August in concerning
custody and and including Cotter 1958.
and the Formerly Program the parcels radiological Middlesex (high-grade mill in disposal metal
thorium, in placed the Action operational, near-by the soils pitchblende plant uranium contamination, nearby. here and and environment
uranium, was site under 1980 Remedial was and with contaminated addition, In received Landfill with the from Cotter the community yellowcake operations radioactive the into
containing The in DOE Sites plant the grounds, wastes. contaminated ore) includes site associated of Park Lincoln producing mill released contamination
ores beryllium. the of Utilized (FUSRAP) While buildings, became chemical Municipal uranium The areas the started Historical practices
TBD
CO
City,
Continued Canon
7.1 Park
Table Lincoln

