Boiler Plant Operations                                                                              95


               a little resulting in higher pressures. We tested a large  vessel ruptures could do serious damage. That’s why
               number of compressed air storage tanks for an installa-  flooding a vessel with water for a hydrostatic test is so
               tion in the 1980’s at the request of their inspectors. It’s  important, the water pressure will drop instantly with
               a good thing we did it hydrostatically. Eleven of them  a rupture but any air in the system will expand to push
               failed, four at pressures below the safety setting and one  the water out with considerable force.
               just slightly above normal operating pressure.           A sound test requires the source of pressure be
                    A hydrostatic test, done properly, will not result in  disconnected and the pressure observed for a period of
               injury if the containment fails; a little water will run out  time to ensure there are no leaks. Occasionally the pres-
               and the pressure will drop instantly. A boiler in opera-  sure will increase or decrease as the testing fluid heats
               tion doesn’t fail that pleasantly. Which would you rather  or cools. If leaks are found, drain the system for repair
               have, a rupture (consisting of a leak of cool water) due  and repeat the test when the repairs are complete. Note
               to a hydrostatic test and when you’re looking for it or  that any air test requires precautions and should only be
               an explosion of steam and boiling hot water (or worse)  used when there’s no option.
               when you least expected it? Testing at anything less than     A special test not normally performed is a boiler
               the standard test pressure is providing false hope that  casing test. It ensures there are no significant leaks of the
               the containment won’t fail in operation.             products of combustion from the boiler into the boiler
                    That’s why I said “help ensure” back in that first  room. The test requires blocking the stack, preferably at
               paragraph. Pressure testing a vessel at 150% of its  a point outside the boiler room, and the burner open-
               maximum allowable working pressure still doesn’t  ing into the boiler. The actual test pressure should not
               mean it can’t fail at lower pressures. During operation  exceed the manufacturer’s rating for the casing or any
               temperatures of boilers and many pressure vessels are  ductwork connected to the boiler that is also included in
               substantially higher than the maximum hydrostatic test  the test. The best way to apply pressure is using the test
               temperature. Those higher temperatures introduce ad-  setup shown in the Figure 2-7 which, by it’s construc-
               ditional stress into the vessel and can contribute to fail-  tion, serves as a gauge for the test and a way to prevent
               ure of one that just passed a 150% hydro. It’s even more  exceeding the test pressure. When some bubbles rise
               likely to fail in service if it passed a hydro at normal  through the loop the test pressure is achieved. Once the
               operating pressures.                                 pressure is reached the air supply is disconnected and
                    One reason you always have somebody at the  the level drop observed. It shouldn’t drop more than
               pump or valve controlling the application of pressure  one inch per minute after bubbles stop rising through
               is to release it immediately if a problem is detected.  the column. If leaks are indicated drop the pressure,
               Another is to make certain that the pressure doesn’t  insert a lit smoke bomb through the capped connection,
               exceed the chosen test pressure. If a manufacturer (who  and reinstate test pressure to locate the leak. Reduce air
               has to test at 150%) exceeds the test pressure by more  line to 1/2 inch and other piping to match the size of the
               than 6% the engineering of the vessel must be repeated  observation port if it is less than two inches.
               to ensure it was not subjected to excessive stress during     Note that the 25-inch water leg is selected for boil-
               the hydro. There’s no excuse for letting the test pressure  ers designed for a maximum casing pressure of 25 inch-
               run above the 150% so don’t do it. Ensure the pressure in  es water column. Many are only capable of 10 inches so
               the system never exceeds the specified test pressure by  the leg should be shorter. I normally specify a 25-inch
               more than 6%. If it does, note it in the log and notify the  pressure rating and that’s why the system in Figure 2-7
               manufacturer to determine if any damage was done by  shows it.
               exceeding the test pressure.                             The application of a smoke bomb is necessary to
                    Check electrical circuits that are connected to the  spot leaks in the casing. It’s normally done for a replace-
               systems during hydrostatic tests to ensure the liquid did  ment casing job and I have yet to see one done where a
               not introduce an undesirable ground. Check them again  couple of smoke spurts didn’t point out a spot where the
               after all test apparatus is removed and normal connec-  boilermaker missed a little stretch of casing weld.
               tions reinstated.                                        This test only applies to boilers with casings de-
                    When testing is performed pneumatically (with  signed to operate under pressure. A person should
               air) the test pressure should not exceed 125% of maxi-  remain, hand on air valve, at the test apparatus when-
               mum allowable working pressure. Also, the pressure  ever the compressed air connection is open. Be certain
               must be increased in steps with inspections for leaks at  to remove blanks and any combustible sealing material
               each step. The rapid expansion of the air in the event the  (caulking) when the test is completed.