Maintenance                                                                                         209


               gree with the water that’s in it to create another chemi-  that the glass will break when you tighten the packing.
               cal that helps bond it together. When using heat drying     Packing of pumps usually includes a lantern ring
               material it’s important to avoid letting it air dry. You  (Figure 6-8) that has to be properly positioned in the
               should fire up the boiler to apply the heat in accordance  packing gland. Always count the number of pieces of
               with manufacturer’s instructions as soon as possible.  packing you take out from under one. The lantern ring
               The best option is to use a combination material and it’s  provides a space for distribution of leakage into or out of
               always important to treat all of them gently so the repair  the packing gland. When the packing is sealing the high
               isn’t destroyed in its first few hours of operation. Bring  pressure side of a pump the leakage into the space con-
               the boiler up to operating temperature as slowly as pos-  taining the lantern ring bleeds off to the pump suction,
               sible.                                               which is at a lower pressure. That recovers some of the
                                                                    fluid. The remaining packing, between the lantern ring
                                                                    and atmosphere is only exposed to suction pressure. For
               PACKING                                              cooling and lubricating some flows between the packing
                                                                    and the shaft to the outside of the packing gland.
                    A lot of modern designs and new materials are       When the packing is on the suction side of a pump
               eliminating packing as I know it but it will be a long  operating at pressures equal to or below atmospheric
               time before you won’t encounter a pump, a valve, or  the lantern ring space is piped to the pump discharge
               other device with packing. Packing is material pressed  or an intermediate pump stage. The purpose here is to
               into a space between a metal housing and a metal shaft  provide lubrication of the packing and shaft plus seal-
               to provide a seal to prevent or control leakage of water,  ing the pump to prevent air leaking into the fluid. That’s
               steam, or another fluid.                             important for condensate pumps to keep oxygen out of
                    I trust you noted that I used the words (or control  the condensate. Flow in that case is into the lantern ring
               leakage) because in many pumps that’s very important.  space. It then splits with some flowing into the pump
               I’ve run into many a new operator or maintenance tech-  suction and the rest leaking out of the packing gland in
               nician that was thoroughly convinced that the packing  the other direction.
               on a pump shouldn’t leak and destroyed the pump by       Whenever you’re re-packing a pump you should
               tightening the packing to stop the leak. Unless a small  be aware that the gland could contain a lantern ring. I re-
               amount of fluid leaks along a constantly moving shaft  member seeing one feed pump where the operators were
               to lubricate the shaft, and protect it from rubbing, the                       not aware of the packing
               packing will cut into the shaft. If you ever see a pump                        gland and had repeatedly
               shaft or sleeve reduced in diameter with gouges from                           pressed the packing down
               the packing that’s what happens.                                               until the lantern ring was
                    Whether it’s a pump, a valve, a control float, it re-
               ally doesn’t matter, there’s a standard arrangement for
               installing packing. Many leaky valves I’ve seen consist
               of a repair where the installer simply wrapped packing
               around the shaft in a spiral, cut it off, jammed it in, and
               expected it to seal. That doesn’t work. Packing should be
               arranged in cut segments that barely fit around the shaft
               stacked as shown in Figure 6-7. The stacking doesn’t
               have to be precisely as shown, just alternate placing
               the open seams first 180 degrees out of phase then 90
               degrees to produce a complex path for any leakage to
               follow.
                    It’s actually better to have the packing rings cut a
               little short than a little long. If you have to jam the ends
               together to get the packing into the opening it will create
               a hard bump that can bear all the pressure placed on the
               packing gland so the rest of the packing ring isn’t com-
                                                                           Figure 6-7.               Figure 6-8.
               pressed and doesn’t seal. If you jam ends when packing
                                                                     Packing segment stack          Lantern ring
               the gland on a gauge glass you’ve increased the odds
   219   220   221   222   223   224   225   226   227   228   229