Page 235 - Boiler_Operators_Handbook,_Second_Edition
P. 235

220                                                                               Boiler Operator’s Handbook


               should also remove any scale from the end of the tube,  company or state boiler inspector to be certain you can
               making certain it is clean, round, and smooth so there’s  re-weld them under the local law. Most states require
               a good metal to metal fit between the plug and tube.  all welded repairs be performed by an authorized con-
               Gently tap the plug into the tube, the water pressure will  tractor that is approved by the State or holds a National
               hold it and hammering excessively can distort the drum  Board Certificate of Authorization to repair boilers,
               or header.                                           what we call an “R” stamp. It really is a stamp, the au-
                    Plugging of fire tubes requires not only a plug but a  thorized company actually has a steel stamp that is used
               means of holding them in because the water will leak to  to mark the boiler when the welded repair is done.
               the fireside of the tube and apply pressure to the plugs.     The first step in replacing a tube is removing the
               A piece of cold rolled steel rod longer than the tube and  old one. Whenever it’s possible the tube should be cut
               threaded at the ends is required along with nuts and  off and removed, leaving the ends in the drum, header
               plugs that are bored to accept the steel rod. At least with  or tube sheet. Replacement of some water tubes in bent
               the rod you are certain you’ve got the right tube ends.  tube watertube boilers requires removal of other tubes
               The rod has to be large enough to overcome the force of  to gain access to the tube that’s to be removed. It’s pos-
               the water pressure against the plug and produce enough  sible that you will have to remove several good tubes to
               force to seal the plug and the end of the tube. The tube  remove a defective one.
               end must be cleaned as described for watertube boilers.     Removing a tube from a firetube boiler is pretty
               The plugs also have to have a means of sealing the space  much restricted to pulling it out of the hole it’s in-
               between the rod and the plug. An advantage of plug-  stalled in. If the tube is heavily scaled it may be neces-
               ging a firetube boiler is you can tighten the plug while  sary to remove it from the inside and that could require
               the boiler is under hydrostatic test to try to seal a leak.  removal of several other tubes. A single tube replace-
               You can also plug a boiler while it’s under water pres-  ment in a firetube boiler is seldom located where the
               sure but, for most operations, the plugging of a firetube  tube can be removed via a handhole or manhole. The
               boiler is so involved that it’s much easier to just replace  holes in the tubesheet of a firetube boiler are made a
               the tube.                                            bit larger than the tube so slight accumulations of scale
                    A common repair for many water tube boilers in-  will slip through the hole. In some cases the scale is
               volves replacing a section of the boiler tube. Frequently  stripped from the tube as it is removed. In extreme situ-
               it’s only a portion of the half of the tube that faces the  ations it’s necessary to split and collapse the entire tube
               furnace.  When  bulges  or  blisters  form  due  to  scale  to get it out.
               buildup, and sometimes rupture, the rest of the tube is     Removing the tube requires crushing or cutting
               still intact and the original thickness. The repair requires  away the tube end where it is expanded into the drum,
               a skilled boilermaker welder. The tube is cut out around  header or tube sheet. I’ve seen several boilers seriously
               the failure, normally in an elliptical form, and a piece  damaged by inexperienced or careless contractors cut-
               cut from another tube is inserted in its place with the  ting the tubes with a torch and one case where a repeat
               edges of the original tube and patch butt welded. Since  repair was necessary in very few months because the
               the tube walls are so thin (less than 1/8 inch) the weld is  contractor cut the tube sheet with a torch and put new
               normally made by GTAW (gas shielded tungsten tip arc  tubes in without repairing the cuts. If your personnel or
               welding also called TIG) welding.                    a contractor uses a torch to cut the tubes inspect every
                    Entire sections of boiler tubes can be removed and  opening to ensure the tube holes are smooth and clean
               replaced in a similar manner. The elliptical patch is used  so a new tube will seat properly in the hole when it’s
               at either end so the welder can reach through the open-  expanded.
               ing provided for it to reach the butt joint at the back of     The best way to remove a tube end is to chisel it
               the tube. The welder has to work on the inside of the  out, making certain you never touch the tube sheet,
               tube at the back because there’s no room to get to it from  drum or header with the chisel. It eliminates the risk
               the back. Once the back is welded the patch is set and  of cutting the inside of the tube hole but it takes longer
               welded to complete the repair. That method is referred  and, quite frankly, takes more skill. By cutting a shal-
               to as using a “window weld.”                         low (about half the tube thickness) groove through the
                    Replacing a boiler tube is best done by a boiler-  tube where it’s expanded you produce the same effect
               maker who has the skill and experience necessary to do  as flame cutting. After the tube is cut by driving it to
               the job right but you can do it if you have the tools. If the  the center you can collapse the tube into the middle,
               tube is welded you should check with your insurance  away from the tube hole, so the end or whole tube, can