Page 319 - CNC Robotics
P. 319

CNC Robotics


                              printed circuit boardconstruction (continued)
                                drilling holes in , 100- 101 , 100, 101, 102
                                etching process in, 93-97, 93, 94, 95, 96
                                interface board, 80. 81
                                materials and too ls for, 77, 78
                                photo resist process in. 78
                                printing th e artwork for, 80-82
                                soldering in, 101, 103, 103
                                static electricity protection in, 104, 104
                                tinning in, 96. 9 7
                                toner transfer process in, 85-92 , 87 , 88, 89, 90, 91,92
                                top of driver board, 80, 80
                              printers, for PCB construction. 80-82
                              programming (See KCam and programming)

                              raster graphics, 238 - 239
                              ready rod, 9
                              Richardson Electro nics. 293. 295
                              ripple current. in motors. 68
                              rotar y tool eng raving (Master Craft), 274-2 77, 274- 277
                              route r
                                holder for, 252 -25 7, 252-257
                                routing with , 278 -292, 278-292

                              Sanyo Denki, 16, 300
                              shapes.pit file , 26 1- 262, 261, 262
                              side view of CNC machine. 10
                              sign makin g. 278-28 1, 278-280
                              SKF Inc., 298-299
                              software setup and driver testing. 10- 12, 113-13 2
                                case enclo sure for electronics and , 124- 132, 125, 132
                                circle test tile in, 123- 124, 124
                                CNC co ntrols sett ing in , 117, 117, 120, 120
                                Kea rn installat ion for. 11 3-11 4
                                materials nceded for. 113
                                port assignment in. 115. 11 6, 116. 11 8
                                Square-gc.txt test file for, 121, 122
                                steps setting <table setup) for motor in, 11 6-117 . 11 7
                                System Timing window for, 114-1 15. J14. J15
                                test file creation in. 121- 122
                                triangle test file tor, 122- I 23, 123
                              solder ing, 101, 103, 103
                              sources of materials, 293 -301
                              springs tor tool holders, 249 , 250
                              Square- gc.txt test file, 121, 122
                              stained glass w indow plotter, 263 - 268 , 264
                              static electricity protection, 104, 104
                              stepper motor (See motors)
                              steps sett ing (table setup) tor motor, 116- 117, 117
                              system timing, 114-115 , 114, 115, 217,217

        310
   314   315   316   317   318   319   320   321   322