Page 275 - Challenges in Corrosion Costs Causes Consequences and Control(2015)
P. 275

Equipment  Digging  equipment  Nondigging  equipment  items Specialty  Transportation






                                                         repair

                           Material  Pipe  Coating  Sleeves  Fittings  Cathodic  protection  Specialty  items





                                     versus  and  skill  limitations  restoration  Availability


                           Labor  Contractor  versus  internal  Bidding  lower  time  material  Employee  level  Job  issues  Availability  Location  Site








                        Rehabilitation  Operating  Interruptibility  to  Ability  pressure  Cathodic  protection  Welding  Regulations  Company  standards  Union  requirements  Benefits





                        Pipeline     Location  condition  Drainage  conditions  facilities  Environmental  Legal  issues  issues



                        for  Burial  Depth  Soil    Season  Other
                        Considered




                        be  Anomalies               Concentration  loss
                        to     Position  Size  Quantity  Profile  Wall  Cause
                        Factors


                        4.23                    thickness      specifications

                        TABLE  Pipe  Size  Span  Grade  Wall  Operating  pressure  Availability  Company



                                                                            253
   270   271   272   273   274   275   276   277   278   279   280