Page 280 - Chemical engineering design
P. 280
Time base mid 2004
10,000.0 COSTING AND PROJECT EVALUATION 255
Equipment cost, £ 1
2
1000.0
1.0 10.0 100.0 1000.0
Heat transfer area
(a) Pounds sterling
Time base mid 2004
100,000.0
Equipment cost, $ 10,000.0 1
2
1000.0
1.0 10.0 100.0 1000.0
Heat transfer area
(b) US dollars
Type Area scale Material
(1) Gasketed plate m 2 Stainless steel
2
(2) Double pipe m × 10 Carbon steel
Figure 6.4a, b. Gasketed plate and frame and double pipe heat exchangers, Time base mid-2004