Page 280 - Chemical engineering design
P. 280

Time base mid 2004
                               10,000.0  COSTING AND PROJECT EVALUATION                   255


                            Equipment cost, £          1








                                                       2

                                1000.0
                                     1.0          10.0          100.0           1000.0
                                                     Heat transfer area
                                                     (a) Pounds sterling


                                                      Time base mid 2004
                                100,000.0



                            Equipment cost, $  10,000.0  1








                                                           2

                                  1000.0
                                       1.0           10.0          100.0         1000.0
                                                       Heat transfer area
                                                        (b) US dollars

                                        Type             Area scale        Material
                                 (1) Gasketed plate         m 2          Stainless steel
                                                            2
                                 (2) Double pipe          m × 10         Carbon steel
                       Figure 6.4a, b.  Gasketed plate and frame and double pipe heat exchangers, Time base mid-2004
   275   276   277   278   279   280   281   282   283   284   285