Page 281 - Chemical engineering design
P. 281
256
Time base mid 2004
1000.0 CHEMICAL ENGINEERING
Equipment cost, £1000 100.0 4
10.0
2 3
1
1.0
1.0 10.0 100.0
Vessel height, m
(a) Pounds sterling
Time base mid 2004
1000.0
Equipment cost, $1000 100.0 4
3
10.0
2
1
1.0
1.0 10.0 100.0
Vessel height, m
(b) US dollars
Diameter, m Material factors Pressure factors
1 0.5 2.0 C.S. ð 1.0 1 5 bar ð 1.0
3
2 1.0 3.0 S.S. ð 2.0 5 10 ð 1.1
4
Monel ð 3.4 10 20 ð 1.2
S.S. clad ð 1.5 20 30 ð 1.4
Monel ð 2.1 30 40 ð 1.6
clad 40 50 ð 1.8
50 60 ð 2.2
Temperature up to 300 ° C
Figure 6.5a, b. Vertical pressure vessels. Time base mid-2004.
Purchased cost D (bare cost from figure) ð Material factor ð Pressure factor