384 Decision Making Applications in Modern Power Systems
TABLE 14.3 The power quality indices and PPL measured in the three
cases of the system before compensation.
Parameters Case 1 Case 2 Case 3
THDV a (%) 3.91 3.77 4.24
THDV b (%) 4.31 4.90 4.65
THDV c (%) 5.80 6.26 7.52
THDV Mean (%) 4.67 4.97 5.47
VUF (%) 2.89 4.50 2.26
1
V (p.u.) 1.01 1.03 1.04
DPF (%) 86.91 96.26 85.91
PPL (%) 75.40 61.90 85.00
DPF, Displacement power factor; PPL, permissible penetration level; THDV, total voltage
harmonic distortion; VUF, voltage unbalance factor.
TABLE 14.4 The power quality indices and PPL measured in the three
cases of the system after compensation using the proposed compensator.
Parameters Case 1 Case 2 Case 3
THDV a (%) 2.30 2.82 1.66
THDV b (%) 1.00 1.01 0.60
THDV c (%) 1.59 2.19 1.28
THDV Mean (%) 1.63 2.00 1.18
VUF (%) 2.08 0.65 2.34
1
V (p.u.) 1.03 1.05 1.06
DPF (%) 95.93 99.99 95.81
PPL (%) 84.70 99.50 89.00
DPF, Displacement power factor; PPL, permissible penetration level; THDV, total voltage
harmonic distortion; VUF, voltage unbalance factor.
14.5 Conclusion
This paper at first presented an algorithm to find the PPL of the FSWECS
under unbalanced nonsinusoidal voltage and current conditions. Second, a
compensator design, which consists of SC and STF, was suggested for