Page 517 - Decision Making Applications in Modern Power Systems
P. 517

KSTPS-II  TCSC Generating station  (3x210 MW)  Reactor Transmission line  Bus coupler Bus bar (400 kV)  Toward  From Birsinghpur (231 km) Load (or) feeder CT (or) CVT Sipat (765 kV)  Bus-4  Bus-11  (KSTPS-NTPC)  (Sipat)  BRK2  BRK1  60 km  From  GMR (2x685 MW) Ranchi (408 km)  60 km 3LG-Fault  220km  JPL  220km  (3X250 MW)  148
                            2X50 MVAr  125 MVAr  Bus-5  Toward Bhatapara (220 kV)  Bus-7  (Raipur-PGCIL_B)  BSP  (2x250MW)  Toward Bhilai_Pooling (220 kV)  state.



               KSTPS-I  (4x500 MW)  100km        90 km            Bus-6  (BSP-NSPCL)  Chhattisgarh
                   Toward  Vindyachal (215 km)  FD  Fault  198 km  198 km  Bus-3  (Bhilai-Khedamara)  of

                       17 km  CVT  CT         50 MVAr  50 MVAr         20 km  network

                Korba West-II  (1x500 MW)  2X50 MVAr  170 km  Toward  KWB (220 kV)  Bus-14  (Marwa)  50 MVAr  Toward  Raita (220 kV)  Toward  Bhilai (220 kV)  Toward  Bhadrawati (322 km)  transmission



                           Marwa  (2x500 MW)  Toward  140 km  Marwa  140 km  (220 kV)  50 MVAr  65.68 km  65.68 km  50 MVAr  65.68 km  Toward  Koradi (272 km)  Power

                Korba West-I  (2x210 MW)  Bus-1  (Korba West)  50 km  212 km  170 km  Bus-2  (Raipur-  Riata)  Toward  Seoni (250 km)  400 kV  18.1




                                                                           FIGURE
   512   513   514   515   516   517   518   519   520   521   522