Page 517 - Decision Making Applications in Modern Power Systems
P. 517
KSTPS-II TCSC Generating station (3x210 MW) Reactor Transmission line Bus coupler Bus bar (400 kV) Toward From Birsinghpur (231 km) Load (or) feeder CT (or) CVT Sipat (765 kV) Bus-4 Bus-11 (KSTPS-NTPC) (Sipat) BRK2 BRK1 60 km From GMR (2x685 MW) Ranchi (408 km) 60 km 3LG-Fault 220km JPL 220km (3X250 MW) 148
2X50 MVAr 125 MVAr Bus-5 Toward Bhatapara (220 kV) Bus-7 (Raipur-PGCIL_B) BSP (2x250MW) Toward Bhilai_Pooling (220 kV) state.
KSTPS-I (4x500 MW) 100km 90 km Bus-6 (BSP-NSPCL) Chhattisgarh
Toward Vindyachal (215 km) FD Fault 198 km 198 km Bus-3 (Bhilai-Khedamara) of
17 km CVT CT 50 MVAr 50 MVAr 20 km network
Korba West-II (1x500 MW) 2X50 MVAr 170 km Toward KWB (220 kV) Bus-14 (Marwa) 50 MVAr Toward Raita (220 kV) Toward Bhilai (220 kV) Toward Bhadrawati (322 km) transmission
Marwa (2x500 MW) Toward 140 km Marwa 140 km (220 kV) 50 MVAr 65.68 km 65.68 km 50 MVAr 65.68 km Toward Koradi (272 km) Power
Korba West-I (2x210 MW) Bus-1 (Korba West) 50 km 212 km 170 km Bus-2 (Raipur- Riata) Toward Seoni (250 km) 400 kV 18.1
FIGURE