Page 518 - Decision Making Applications in Modern Power Systems
P. 518
TCSC Reactor Bus coupler CT (or) CVT Toward Bhadrawati (345km)
Bus-11 (Sipat) 148 km 125 MVAr
Generating station Transmission line Bus bar (400 kV) Load (or) feeder From (2x685 MW) Ranchi (408 km) 148 km 148 km Toward Durg (765 kV) 80 MVAr 50 MVAr Toward 225 km Raipur_PGCIL-A (220 kV) 63 MVAr 63 MVAr 80 MVAr
Sipat (765 kV) GMR Bus-13 (GMR) 40 km 40 km Bus-12 (Durg) 25 km 25 km 225 km 63 MVAr 4X50 MVAr
From BRK2 Bus-8 (Raipur-PGCIL_A)
60 km Bus-10 (JPL) 125 MVAr TCSC Toward Raigarh-PGCIL (220 kV) 50 MVAr Toward Rourkela (220 km)
JPL (3X250 MW) 254 km 254 km 50 MVAr 50 MVAr 225 km 225 km 50 MVAr
60 km
(KSTPS-NTPC)
Bus-4
Toward Birsinghpur (231 km) BRK1 3LG-Fault 220km Toward JPL (220 kV) 2X125 MVAr Toward Warda (363 km) 14km Bus-9 (Raigarh)
KSTPS-II (3x210 MW) 220km (Bhatapara-PGCIL) 14km
2X50 MVAr 125 MVAr Bus-5 Toward Bhatapara (220 kV) Bus-7 (Raipur-PGCIL_B) BSP (2x250MW) Toward Bhilai_Pooling (220 kV) state.
KSTPS-I (4x500 MW) 100km 90 km Bus-6 (BSP-NSPCL) Chhattisgarh
Toward Vindyachal (215 km) FD Fault 198 km 198 km Bus-3 (Bhilai-Khedamara) of
17 km CVT CT 50 MVAr 50 MVAr 20 km network
Korba West-II (1x500 MW) 2X50 MVAr 170 km Toward KWB (220 kV) Bus-14 (Marwa) 50 MVAr Toward Raita (220 kV) Toward Bhilai (220 kV) Toward Bhadrawati (322 km) transmission
Marwa (2x500 MW) Toward 140 km Marwa 140 km (220 kV) 50 MVAr 65.68 km 65.68 km 50 MVAr 65.68 km Toward Koradi (272 km) Power
Korba West-I (2x210 MW) Bus-1 (Korba West) 50 km 212 km 170 km Bus-2 (Raipur- Riata) Toward Seoni (250 km) 400 kV 18.1
FIGURE