Page 216 - Design for Six Sigma for Service (Six SIGMA Operational Methods)
P. 216

Value Engineering  185

                    43.1% total budget
                       Confirm
                        design
                8.80%          13.6%
         Produce  Transmit    Create       Authorise  Prepare  Establish  Utilise
         product  information  design       program  plan  need  knowledge
                                    Determine
                       Confirm      direction
                      information

                Support
                activity
        Figure 7.19 FAST Diagram for Engineering Operation



        engineering funds. The immediate recommendation was to review all
        areas involved in the “confirm design” function. By following the value-
        engineering job plan, major changes were made in several areas that sub-
        stantially increased output, cost saving, and avoidance of major capital
        investment. A substantial cost reduction was achieved without affecting the
        vital design functions.
   211   212   213   214   215   216   217   218   219   220   221