Page 216 - Design for Six Sigma for Service (Six SIGMA Operational Methods)
P. 216
Value Engineering 185
43.1% total budget
Confirm
design
8.80% 13.6%
Produce Transmit Create Authorise Prepare Establish Utilise
product information design program plan need knowledge
Determine
Confirm direction
information
Support
activity
Figure 7.19 FAST Diagram for Engineering Operation
engineering funds. The immediate recommendation was to review all
areas involved in the “confirm design” function. By following the value-
engineering job plan, major changes were made in several areas that sub-
stantially increased output, cost saving, and avoidance of major capital
investment. A substantial cost reduction was achieved without affecting the
vital design functions.