Page 214 - Design for Six Sigma for Service (Six SIGMA Operational Methods)
P. 214
Create Make Collect Evaluate Conf. Auth. Model Data Info. Design Prog. Design 560 560 420 140 3,360 750 3,000 4,200 1,200 180 180 480 780 1040 8,320 4,800 400 800 8,600 4,800
Functions Trans. Info. 280 190 880
Cost-Function Work Sheet (Continued) Hours 11,109 22,560 Development 4,909 Design leader 22,204 17,580 3,392 26,528 $198,000
Table 7.23 Cost (Hours) Item Activity No. Design engr 9 10 engr 11 Technician 12 Modeler 13 Clerk 14 Mechanics 15 Material 16 Material Total Hours Total
184

