Page 215 - Design for Six Sigma for Service (Six SIGMA Operational Methods)
P. 215
Make Model 750 8,600
Collect Data 560 3,000 4,800
Evaluate Info. 560 4,200 180 780 400
Conf. Design 420 1,200 180 1040 800
Auth. Prog. 140
Create Design 3,360 480 8,320 4,800
Functions Trans. Info. 280 190 880
Cost-Function Work Sheet (Continued) Hours 11,109 Design engr 22,560 Development 4,909 Design leader 22,204 17,580 3,392 26,528 $198,000
Table 7.23 Cost (Hours) Item Activity No. 9 10 engr 11 Technician 12 Modeler 13 Clerk 14 Mechanics 15 Material 16 Material Total Hours Total
184