Page 447 - Design of Simple and Robust Process Plants
P. 447
434 Chapter 10 The Efficient Design and Continuous Improvement of High-quality Process Plants
VIP Application Timeline
FEL- 1 FEL- 2 FEL- 3
Feasibility Eng. Conceptual Eng. Basic Eng.
Environmental
Maintenance
Classes of Process
plant quality simplification Reliability modeling
major equip. details Evaluation
$ EST PFD $ EST P&ID $ EST
Technology Process & Design to Project Value
Selection Energy Optim Capacity Standards Engineering
Constructibility
Fig. 10.8. VIPs implementation time line during FEL (Source IPA Inc.).
Vip Application Time line
Detailed Eng. Construction / Start-up Operation / Evaluation
Environmental
Maintenance
Reliability modeling
Value
Engineering
er
Detailed Eng Construction Start-up Op ation Evaluation
Project
Standards All VIPs
Constructibility
Fig. 10.9. VIPs implementation time line during: design
engineering, construction and operation.