Page 192 - Dynamics and Control of Nuclear Reactors
P. 192

Further reading   189




                  [10] B.R. Upadhyaya, M. Kitamura, Stability monitoring of boiling water reactors by time
                      series analysis of neutron noise, Nucl. Sci. Eng. 77 (1981) 480–492.
                  [11] B.R. Upadhyaya, T.W. Kerlin, Estimation of response time characteristics of platinum
                      resistance thermometers by the noise analysis technique, ISA Trans. 17 (1978) 21–38.
                  [12] G.E.P. Box, G.M. Jenkins, Time Series Analysis: Forecasting and Control, Holden-Day,
                      San Francisco, 1970.
                  [13] U.S. Nuclear Regulatory Commission Standard Review Plan, Boiling Water Reactor Sta-
                      bility, NUREG-0800, March, 2007.


                  Further reading

                  [14] International Atomic Energy Agency, Boiling Water Reactor Simulator Training Course
                      Series No. 23, available at, www.pub.iaea.org/MTCD/publications/PDF/TCS-23_web.
                      pdf.
                  [15] General electric advanced technology manual, Chapter 6.2, BWR Primary Contain-
                      ments, U.S. Nuclear Regulatory Commission, https://www.nrc.gov/docs/ML1414/
                      ML14140A181.pdf.
                  [16] ABWR Design Control Document, prepared by GE Nuclear Energy for the U.S. Nuclear
                      Regulatory Commission, 1997.
   187   188   189   190   191   192   193   194   195   196   197