Page 27 - Electrical Engineering Dictionary
P. 27

than the thermal energy kT . Contrast with  ty of the image. For example a leak factor of
                              3-level laser.                         31  the prediction decay is maintained at the
                                                                     32
                                                                     center of the dynamic range.
                              45 Mbs DPCM for NTSC color video
                              a codec wherein a subjectively pleasing pic-
                                                                                     31
                              ture is required at the receiver. This does  X = 128 +    X − 128 .
                                                                           −
                                                                                          −
                                                                           L
                              not require transparent coding quality typical         32
                              of TV signals. The output bit-rate for video  Finally, a clipper at the coder and decoder
                              matchestheDS344.736Megabitspersecond   is employed to prevent quantization errors.
                              rate. The coding is done by PCM coding the
                              NTSC composite video signal at three times  90% withstand voltage  a measure of
                              the color subcarrier frequency using 8 bit per  the practical lightning or switching-surge im-
                              pixel. Prediction of current pixel is obtained  pulse withstand capability of a piece of power
                              by averaging the pixel three after current and  equipment. This voltage withstand level is
                              681 pixels before next to maintain the sub-  two standard deviations above the BIL of the
                              carrier phase. A leak factor is chosen before  equipment.
                              computing prediction error to main the quali-



















































                              c 
2000 by CRC Press LLC
   22   23   24   25   26   27   28   29   30   31   32