Page 235 -
P. 235
X Minimum Move user(s) to Connectivity from each latency of alternate site(s)— site LAN to the 100 dependent upon production server milliseconds site Go-live with established through from point to subset of user connectivity test. point. population. Minimum Move user(s) to upgrades Planned X latency of alternate site(s) complete, if any. Site 100 —dependent network performance miliseconds upon campus— test complete. from point to need to assess point. validity. Percentage Move user(s) to Workstatio
X X X X X
X X X X X X
MX M H HX MX MX
Connectivity between sites and Internet (if needed). Local site network. Workstation Application availability during business hours— production. Application availability during business hours— reporting database. Application availability during business hours— development database.
Infrastructure Readiness Infrastructure Readiness Infrastructure Readiness Infrastructure Readiness Infrastructure Readiness Infrastructure Readiness
Tech Tech Tech Tech Tech Tech
1.08 1.09 1.11 1.12 1.13 1.14
209