Page 235 -
P. 235

X  Minimum Move user(s) to Connectivity from each  latency of alternate site(s)— site LAN to the  100 dependent upon production server  milliseconds site Go-live with established through  from point to subset of user connectivity test.  point. population.  Minimum Move user(s) to  upgrades  Planned  X  latency of alternate site(s) complete, if any. Site  100 —dependent network performance  miliseconds upon campus— test complete.  from point to need to assess  point.  validity.  Percentage Move user(s) to Workstatio
                X                  X                                        X               X                X

                X                  X                  X                     X               X                X
                MX                 M                  H                     HX              MX               MX





                Connectivity between  sites and Internet   (if needed).  Local site network.  Workstation  Application availability  during business hours—  production.  Application availability  during business hours—  reporting database.  Application availability  during business hours—  development database.
















                   Infrastructure  Readiness  Infrastructure  Readiness  Infrastructure  Readiness  Infrastructure  Readiness  Infrastructure  Readiness  Infrastructure  Readiness




                Tech               Tech               Tech                  Tech            Tech             Tech


                1.08               1.09               1.11                  1.12            1.13             1.14


                                                                                                                         209
   230   231   232   233   234   235   236   237   238   239   240