Page 236 -
P. 236

(Continued)






                Minimum  latency of  100  milliseconds  from point to  point.  Minimum  latency of  100  miliseconds  from point to  point.  Percentage  of campus  key users: A  (80%), B  (80%), L  (80%), and  W (75%).  95%  available for  1 month  prior to   Go-live  95%  available for  1 month  prior to   Go-live  95%  available for  1 month  prior to   Go-live











                Move user(s) to  alternate site(s)—  dependent upon  site Go-live with  subset of user  population.  Move user(s) to  alternate site(s)  —dependent  upon campus—  need to assess  validity.  Move user(s) to  alternate site.










                Connectivity from each  site LAN to the  production server  established through  connectivity test.  upgrades  complete, if any. Site  network performance  test complete.  Workstations in place  connectivity test  complete all required  software installed,  tested (system, network,  application, OA).  Application available  during scheduled hours.  Application available  during scheduled hours.  Application available  during scheduled hours.















                X                  Planned  X         X                     X               X                X
                X                  X                                        X               X                X

                X                  X                  X                     X               X                X

                MX                 M                  H                     HX              MX               MX




                Connectivity between  sites and Internet   (if needed).  Local site network.  Workstation  Application availability  during business hours—  production.  Application availability  during business hours—  reporting database.  Application availability  during business hours—  development database.
















                   Infrastructure  Readiness  Infrastructure  Readiness  Infrastructure  Readiness  Infrastructure  Readiness  Infrastructure  Readiness  Infrastructure  Readiness




                Tech               Tech               Tech                  Tech            Tech             Tech


                1.08               1.09               1.11                  1.12            1.13             1.14


                                                                                                                         209
   231   232   233   234   235   236   237   238   239   240   241