X  95% of Manual creation Production classes  classes and of operator IDs configured and tested.  IDs loaded. and passwords. Production User IDs  loaded. Production user  authorization received.  Production User IDs  linked to classes.  Test results Production environment  X  indicate  tested during conversion  Go-live dress rehearsal (after  readiness. data are moved over).  Readiness Operational  Operations  None Production instances  test cycle 2 backed up on regular  passed. schedule. Restore works  successfully.
              X                     X                                           X                  X

              X                     X                                           X                  X
              MX                    HX                X  H                      X  L               X  L




              Production user classes  and user   IDs loaded.  Production environment  stable.  is  Backup/restore ability.  Disaster recovery plan  (includes both technical  and business aspects) —  HIGH AVAILABILITY.  Disaster recovery plan  (includes both technical  and business aspects) —  CATASTROPHIC.

















                 Infrastructure  Readiness  Infrastructure  Readiness  Operational  Readiness  Operational  Readiness  Operational  Readiness




              Tech                  Tech


              1.17                  1.18          2   2.01                      2.02               2.03