Page 241 -
P. 241

Assessment Date
                                       Assessment
                                       Current Actual Status
                                       “Pass Status”
                                               test cycle N
                                    Minimum
                                            Operations
                                                  passed.
                                       Task Contact
                                       Decision Owner
                                                  Employ temps for
                                               multiple printers.
                                            Split print file for
                                       Workaround(s)
                                                        backup printer.
                                                     folding. Utilize
                                                           Utilize backup
                                    Contingent
                                                              folder.
                                               (including backup). All
                                                     installed, configured,
                                            Equipment in place
                                                  required software
                                       Key Measures
                                                        tested.
                                                                  X  Approved Utilize existing Available for use during  forms forms. Utilize functional training.  distributed to “baseline” forms.  campuses  available to  end users.  Operations Project team Product installed,  test cycle 1 executes jobs configured, tested.  passed. until scheduler Batch performance test  trained and complete. Scheduled  available. jobs entered and tested.  Ad hoc jobs entered and  tested.  First draft Update tables  defined, Procedures  complete.
                                       Group 2
                                                                  X
                                       Group 1
                                                                  X
                                       Site 2
                                            MX                    L                  HX                    X  L
                                       Site 1
                                       Criticality
                                       Criterion  Central high-speed  printer and other  central printing services.  Critical forms in place.  Batch scheduler and  production schedule.  Table maintenance—key  procedures in place for  the high-impact data  areas.
                                       Category  Operational  Readiness  Operational  Readiness  Operational  Readiness  Operational  Readiness







                                       Seq  2.04                  2.05               2.06                  2.07A