Section           Three


     ALLOY

     AND

     NON-         FERROUS

     FABRICATION


           This  section  is  intended  to  cover  the  complete  shop fabrication
           and  field  fabrication  and  erection  of  alloy  and  non-ferrous piping.
           Alloy and non-ferrous piping operations are to be man houred on the same
           basis as corresponding carbon steel materials, plus the percentage given
           in the following tables applicable to the carbon steel man hours listed in
           sections one and two.