DEFECTS, DETERIORATION, AND DURABILITY       9.13

             To both of these classifications, one could add another important criterion—whether defer-
             ring repairs would result in greater cost later, not due to inflation, but rather due to an
             increasing-rate mechanism. For example, postponing repair of freeze-thaw damage can
             greatly expand the scope of future remedial work. Postponing remedy of the ponding con-
             dition shown in Fig. 9.6 will lead to premature failure of the roof membrane, requiring
             expensive roof replacement.




















                 FIGURE 9.6  Severe ponding on a roof, which will inevitably lead to membrane failure if not
                 remedied.
               Most building components require at least maintenance, if not replacement, during the
             service life of a building under normal environmental loads. The “weakest link in the
             chain” may compromise all others if not properly addressed. For example, neglecting to
             replace deteriorated sealant joints may lead to the premature failure of adjacent components,
             such as masonry freeze-thaw damage, wood rot, and structural steel corrosion.
               Systems whose failure would pose a threat to public safety or building use require a longer
             design life than those that pose little safety or economic threat. Table 9.3 lists the typical
             design life of representative building components, compiled from several publications. 15,17,18

                      TABLE 9.3 Examples of Building Component Design Life 15,17
                        Building system        Typical design life (in years)

                      Foundation                      >100
                      Structure                       >100
                      Exposed Parking Decks           30
                      Brick Units in Masonry          >100
                      Mortar in Masonry               30
                      Wood Siding                     20–40
                      Doors                           25
                      Windows                         20–40
                      Asphalt Shingles                15–30
                      Roof Membrane                   10–30
                      Finishes                        7–20
                      Floor Covering                  5–10
                      Suspended Ceilings              10–20
                      Concealed Flashing              40
   297   298   299   300   301   302   303   304   305   306   307